+ 359 2 4748 800 info@gcr.bg

Reconstruction Of Auxiliary Systems To 9GQ And 10GQ

Reconstruction Of Auxiliary Systems To 9GQ And 10GQ Overview Employer:NPP KOZLODUY EAD duration:Aug 2018 – Jul 2021 Budget:134 380 EUR Project scope Project design: Reconstruction of auxiliary systems 5.6SS, 5.6ST, and 5.6VC to turbogenerators TVB-1000-4UZ.The...

Photovoltaic Power Plant in Water World – Bankya

Photovoltaic Power Plant Water World – Bankya Overview Employer:Voden Svyat – Bankya AD duration:Jun 2023 – Aug 2023 Project site The installed peak power of the Photovoltaic Power Plant (PPP) is 12.6kWp, and the capacity of the local energy storage...