Delivery and installation of one set of EMPS for the axial bearing of HG-1 at Momina Klisura HPP
Overview
- Employer:
National electric company - duration:
June 2021 – September 2021
Object
Delivery and installation of one set of EMPS for the axial bearing of HG-1 in the Momina Klisura HPP.
The delivery of segments for the axial bearing of HG-1 in HPP Momina Klisura has been completed.
The segments are made by JSC CHOEZ Energozapchast – Russia according to drawings provided by the manufacturer after coordination with the Assignor. GCR AD supervised the installation of the segments and participated in the commissioning tests.
Results
The delivered segments increase the reliability in the operation of the hydropower unit, have better operational characteristics than their babbitt analogues and have a service life of more than 30 years.