+ 359 2 4748 800 info@gcr.bg

PORTFOLIO

OUR PROJECTS

GCR Projects


Update of Level 1 Probabilistic Safety Analysis with expansion of the scope of analysis for Units 5 and 6 of Kozlooduy NPP

Update of Level 1 Probabilistic Safety Analysis with expansion of the scope of analysis for Units 5 and 6 of Kozlooduy NPP

Delivery and installation of one set of EMPS for the axial bearing of HG-1 at “Momina Klisura” HPP

Delivery and installation of one set of EMPS for the axial bearing of HG-1 at “Momina Klisura” HPP

Expertise of selected reports from stage 2 of the project for extension of the operation period of Unit 6 of Kozloduy NPP, related to justification of the possibility for safe operation of the reactor vessel and part of the main building structures

Expertise of selected reports from stage 2 of the project for extension of the operation period of Unit 6 of Kozloduy NPP, related to justification of the possibility for safe operation of the reactor vessel and part of the main building structures

Replacement of pumps KV01MP01 / 02/03, pump HS55MP03, pumps KV30MP01 / 02 and gas blowers RD05WF01 / 02 in SFSF

Replacement of pumps KV01MP01 / 02/03, pump HS55MP03, pumps KV30MP01 / 02 and gas blowers RD05WF01 / 02 in SFSF

Design for replacement of hydraulic shock absorber 5 TQ40J01

Design for replacement of hydraulic shock absorber 5 TQ40J01

Consultancy services for El Dabaa Nuclear Power Plant Project in Egypt

Consultancy services for El Dabaa Nuclear Power Plant Project in Egypt

Project for repair of steam turbine PR-8,8-4,1 / 1,1 / 0,4 and its coupling to a new generator type T-12-2UZ

Project for repair of steam turbine PR-8,8-4,1 / 1,1 / 0,4 and its coupling to a new generator type T-12-2UZ

Reconstruction of SS to 9_10GQ

Reconstruction of SS to 9_10GQ

Modernization of turbine unit TG3 with new back-pressure turbine at Sofia East TPP

Modernization of turbine unit TG3 with new back-pressure turbine at Sofia East TPP

Energy efficiency measures of the Administrative building “Coastal pumping station”- 20 KV

Energy efficiency measures of the Administrative building “Coastal pumping station”- 20 KV

Reconstruction of the water supply and sewerage system (WS) in the Central Alarm Station (CAS)

Reconstruction of the water supply and sewerage system (WS) in the Central Alarm Station (CAS)

Engineering Services and Support of QA: Application and enhancement of TRACE model

Engineering Services and Support of QA: Application and enhancement of TRACE model