+ 359 2 4748 800 info@gcr.bg

Reconstruction of the water supply and sewerage system (WS) in the Central Alarm Station (CAS)


Overview

  • Employer:
    Kozloduy NPP EAD
  • Implementation period:
    November 2018 – October 2019
  • Project value: 
    BGN 52 733.31
  • Partner companies in the project implementation:
    Stromet 2004 EOOD – Kozloduy
    ART – 07 EOOD – Sofia
    GROZDANOV CONSULT EOOD – Sofia
    INPLAN OOD – Sofia

Object

The central alarm station is located in the basement of the Occupational Medicine Service, EG-2 of Kozloduy NPP. It consists of several rooms in which communication and computer equipment are located, exposed to the risk of flooding in case of accident of passing water and sewage branches.

 

Scope of the project

  • Preparation of working projects in Architecture, WS, safety plan and health and safety plan in order to search the water supply and sewerage branches of the building, as well as solving the problems with rainwater drainage;
  • Delivery and incoming control of materials;
  • Execution of construction and installation works according to the projects approved by the Employer.

 

Results

Refurbished water supply and sewerage branches in order to protect the communication and computer equipment of CAS;

Repair and refreshment of the sanitary premises and part of the doctor’s offices of the Occupational Medicine Service